Skip to content

Kyros x Enertrag

The next scheduled delivery in 2025 marks an important milestone for Kyros. We are proud to supply our largest system to date — a 4 MW electrolysis plant — to Enertrag SE for fueling the Heidekrautbahn with hydrogen.

A key feature of this project is the departure from the traditional container-based design; the system will be installed in a building specifically constructed for electrolysis operations.

In addition to the electrolyzer, the delivery includes a comprehensive range of advanced measurement technologies.